Er, B.
Berkay Er is a Process Control Engineer at the Tupras Izmir refinery, where he is responsible for implementation, maintenance and performance monitoring of APC projects. His responsibilities include base layer control enhancement, DCS management and alarm management implementations. He earned a BS degree in chemical engineering from Ege Unıversity. He can be reached at berkay.er@tupras.com.tr.
Base layer enhancement study for crude oil distillation process
Base layer control is one of the most important stages of a process control system hierarchy for refinery applications.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell to supply integrated automation systems for flagship UK carbon capture projects 12/4
- Aduro Clean Technologies collaborates with ECOCE to advance plastics recycling in Mexico 12/4
- FincoEnergies launches GoodFuels B15: A reliable and compliant drop-in biofuel for inland shipping 12/4
- DevvStream, Southern Energy Renewables target low-cost, carbon-negative SAF and green methanol 12/4
- AFPM: Revised fuel economy standards would put CAFE back on solid legal footing 12/4
- ITT introduced a secondary containment system for its ICM metallic magnetic drive process pump 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

