Dey, P. K.
Integrated approach to materials management: a case study
Business process re-engineering provided a substantial improvement to this function
Integrated approach to materials management: a case study Table 3
  Table 3. Total improvement   ..
Quantitative risk management aids refinery construction
Combining the Analytic Hierarchy Process and decision tree analysis provides an effective means for controlling a complex project
Project management system for a concurrent engineering framework
Case study of a project in India demonstrates how a planning structure was applied to complete the job on a fast track
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to invest £150 MM at Grangemouth site 12/17
- KBR’s methanol technology selected by Fikrat Al-Tadweer for the first biomethanol plant in Saudi Arabia 12/17
- Digital Exclusive: Root cause analysis on hydrochloric acid corrosion in a diesel hydrotreater unit 12/16
- Digital Feature: Enabling growth through strategic cost optimization for petrochemical and refining companies 12/16
- Rohm awards NextChem feasibility study for PMMA-polymer chemical recycling plant project 12/16
- Westlake to rationalize certain North American chlorovinyl and styrene assets 12/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction