Shipman, R.
Ray Shipman is a process manager in downstream process engineering within the process plants and industrial business of Wood Group Mustang. He has more than 35 years of industry experience, including 20 years at Wood Group Mustang, where his responsibilities include feasibility studies, front-end design and detailed engineering of refinery and petrochemical processing units. Mr. Shipman is a registered professional engineer in Texas and holds a BS degree in chemical engineering from Rice University.
Analyze abnormal operations of an HDS reactor loop with dynamic simulation
Hydrodesulfurization units are used in a petroleum refinery to process a variety of feeds to alter composition via the addition of hydrogen.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

