Lessons learned from a refinery revamp project
Revamp projects are inherently challenging due to the numerous constraints imposed by existing equipment design and space limitations.
Take a quicker approach to staggered blowdown
Environment & Safety
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Construction
/ Engineering & Design
/ Equipment
/ Europe
/ Loss Prevention
/ Middle East
/ Piping
/ Reactors
/ Safety
/ Valves
The design of a reliable blowdown system for a large sour gas-processing facility is one of the most important aspects of plant design. Safe design is vital for facility operation. With the developmen..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell collaborates with SAF One and Tata Projects to enable sustainable aviation fuel production 1/29
- Casale and OMNI Sign MoA to jointly advance waste-to-green methanol and hydrogen technologies 1/29
- GIZ and thyssenkrupp nucera partner to advance green hydrogen and power-to-X markets in India 1/29
- IACS issues new Unified Requirement on ammonia release mitigation systems 1/29
- TotalEnergies and Mozambique announce the full restart of the $20-B Mozambique LNG project 1/29
- CF Industries, POET launch low-carbon fertilizer pilot to cut ethanol production carbon intensity 1/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction