October 2011

Trends and Resources

HP Construction: South America

Foster Wheeler’s Global Engineering and Construction Group has been released to perform the second phase scope for an existing contract with Ecopetrol S.A. for modernization of the refinery in Ba..

Meche, Helen, Hydrocarbon Processing Staff

Foster Wheeler’s Global Engineering and Construction Group has been released to perform the second phase scope for an existing contract with Ecopetrol S.A. for modernization of the refinery in Barrancabermeja (PMRB), Colombia. This release includes additional project management consultancy (PMC) and front-end engineering design (FEED), detailed engineering for the crude unit revamps, assisting Ecopetrol in the selection process for engineering, procurement and construction (EPC) contracts, as well as control and supervision of the EPC and construction contractors. The second phase of the PMRB will add heavy-crude processing capability to take advantage of the available domestic heavy

Log in to view this article.

Not Yet A Subscriber? Here are Your Options.

1) Start a FREE TRIAL SUBSCRIPTION and gain access to all articles in the current issue of Hydrocarbon Processing magazine.

2) SUBSCRIBE to Hydrocarbon Processing magazine in print or digital format and gain IMMEDIATE ACCESS to the current issue as well as to 3 articles from the HP archives per month. $239 for an annual subscription.

3) Start a FULL ACCESS PLAN SUBSCRIPTION and regain IMMEDIATE ACCESS to this article, the current issue, all past issues in the HP Archive, the HP Process Handbooks, HP Market Data, and more. $1,695 for an annual subscription.  For information about group rates or multi-year terms, contact J'Nette Nichols-Davis at  jnette.davis-nichols@gulfpub.com or +1 713.520.4426.

Related Articles

From the Archive

Comments