Magazine Archive
Use these links to access our full archive of Hydrocarbon Processing magazine issues:
2025 , 2024 , 2023 , 2022 , 2021 , 2020 , 2019 , 2018 , 2017 , 2016 , 2015 , 2014 , 2013 , 2012 , 2011 , 2010 , 2009 , 2008 , 2007 , 2006 , 2005 , 2004 , 2003 , 2002 , 2001 , 2000 , 1999 , 1998 , 1997 , 1996 , 1995May 2022
- Special Focus: Biofuels, Alternative Fuels and Green Petrochemicals
- Digital Technology
- Carbon Capture/CO2 Mitigation
- Process Optimization
- Catalysts
- 100th Anniversary
- Sustainability
- Plant Turnarounds and Project Management
- Valves, Pumps and Turbomachinery
- Heat Transfer
- Water Management
- Columns
- Trends and Resources
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell to supply integrated automation systems for flagship UK carbon capture projects 12/4
- Aduro Clean Technologies collaborates with ECOCE to advance plastics recycling in Mexico 12/4
- FincoEnergies launches GoodFuels B15: A reliable and compliant drop-in biofuel for inland shipping 12/4
- DevvStream, Southern Energy Renewables target low-cost, carbon-negative SAF and green methanol 12/4
- AFPM: Revised fuel economy standards would put CAFE back on solid legal footing 12/4
- ITT introduced a secondary containment system for its ICM metallic magnetic drive process pump 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

