March 2024
Environment and Safety
An ignition control nightmare—Protecting assets from a lightning strike
Design engineers put forth their best efforts to forecast all risks for their processing plant and strive to embed optimum controls in design, commissioning, operations and maintenance to prevent these risks during the plant’s lifecycle.
This is a preview of our premium content. Thank you for your interest—please log in or subscribe to read the full article.
The Author
Related Articles
- Design an efficient and cost-effective system for corrosion deterioration mechanism diagnosis and detection planning
- Design safer reactors: Use nullcline analysis to predict transient behavior in CSTRs
- Transform gas metering and pipeline monitoring through digitalization: Is hydrocarbon dewpoint a dependable metric?


Comments