The table below lists planned and unplanned refinery shutdowns for 2025 and 2026 compiled through a survey of Asian oil refiners and market sources.

(* Marks latest updates on planned maintenance or outages)

Latest news:

  • Taiwan's FPCC plans to shut crude, secondary units in March
  • Japan's Eneos plans to shut Marifu CDU in mid-January for maintenance
  • Sinopec Luoyang Petrochemical shuts crude units for maintenance
  • China's Sinochem shuts one crude unit at Quanzhou after fire

  • Country Company/Location Unit Capacity (in '000 bpd unless specified) Timing
    2026        
    TAIWAN* FPCC/Mailiao CDU No. 2, residual desulphurisation unit, residual catalytic cracker 540 Mid-March for 40 days until H2 April
    TAIWAN* FPCC/Mailiao One of two vacuum distillation units, one delayed coker unit and base oil unit Not specified October-November
    JAPAN* ENEOS/Marifu CDU 128 Mid-January - early April
             
    2025        
    CHINA Sinopec/Beihai CDU 125 February 25 to April 25
    CHINA CNOOC/Huizhou CDU 220 early March, for up to 2 months
    CHINA Sinopec/Jiangsu CDU 290 end-March to mid-May
    CHINA Sinopec/Jiujiang CDU 150 March 15 to May 10
    CHINA Sinopec/Gaoqiao CDU 260 March 20 to May 20
    CHINA Sinopec/Tianjin No. 3 CDU 220 April 16 to June 14
    CHINA Sinopec/Jinling CDU 380 April 1 to May 25
    CHINA Sinopec/Hainan CDU 184 early April to end-May
    CHINA Sinopec/Shanghai CDU 320 October 9 to December 7
    CHINA* Sinochem/Quanzhou CDU 300 November 25, 2 months
    CHINA PetroChina/Dalian CDU 200 End June, full closure for relocation
    CHINA* Sinopec/Luoyang CDU 240 November
    INDIA MRPL/Mangalore CDU 144 Mid-May, for 30-45 days
    INDIA Reliance/Jamnagar Refinery 660 April 9 for 21 days
    INDIA IOC/Gujarat Refinery 360 June-July
    INDIA Bharat/Bina Refinery 156 August 11 for 15 days
    TAIWAN Formosa/Mailiao RFCC 540 March 3 for 84 days
    TAIWAN Formosa/Mailiao Refinery 540 No.2 residue hydrodesulphurisation unit from September 16 to October 26, No.2 residual fluid catalytic cracking unit from September 9 to November 3 (Crude processing reduced to 360,000 bpd from 500,000 bpd)
    TAIWAN CPC Corp/Talin CDU 150 Mid September to second half of November
    S.KOREA SK Energy/Ulsan CDU 110 end-May to end-June
    S.KOREA SK Energy/Ulsan HDS 40 mid-March to mid-May
    S.KOREA GS Caltex/Yeosu CDU 330 end-Feb to end-March
    JAPAN Eneos/Chiba CDU 129 January 22 - end-March
    JAPAN Eneos/Mizushima-B No. 3 CDU 105 Febuary 26 to June 3
    JAPAN Eneos/Mizushima-B CDU 141 May 16 to early July
    JAPAN Idemitsu/Yokkaichi No. 3 CDU 155 May 19 to August 11
    JAPAN Fuji Oil/Sodegaura CDU 143 May 9 to July 21
    JAPAN ENEOS/Kawasaki No. 3 CDU 77 August 9 to late November
    JAPAN Idemitsu/Aichi CDU 165 October 8 (undisclosed end date)
    JAPAN Cosmo/Sakai CDU 100 August 27 to October
    JAPAN ENEOS/Kawasaki No. 2 CDU 172.1 August 16 to late November
             
             
    UNPLANNED TURNAROUND:        
    Country Company/Location Unit Capacity ('000 bpd unless specified) Timing/Reasons
    2025        
    S.KOREA SK Energy/Ulsan CDU 170 February 26 for 2 weeks
    JAPAN Eneos/Sakai CDU 140 February 17 (Fire, undisclosed end date)
    JAPAN Eneos/Oita CDU 136 January 21- January 27 (unknown)
    JAPAN Eneos/Kawasaki No. 2 and No. 3 CDU 249.1 April 21 - May 7 (reason undisclosed)
    JAPAN Eneos/Kawasaki No. 3 CDU 77 June 4 to June 5 (reason undisclosed)
    JAPAN Eneos/Mizushima-B No. 2 CDU 95.2 April 24 - May 16 (reason undisclosed)
    JAPAN Eneos/Sendai CDU 145 May 23 (undisclosed reasons or end date)
    JAPAN Cosmo/Chiba CDU 102 May 29 (undisclosed reasons or end date)
    MALAYSIA Prefchem/Pengerang RFCC 70 End January - May 19 (technical problems)
    MALAYSIA Prefchem/Pengerang RFCC 540 September 29, aiming to restart within a week (reason undisclosed)
    CHINA* Sinochem/Quanzhou No. 1 CDU 240 November 14, unspecified
             

AU - Aromatic Unit

CCU - Catalytic Cracker Unit - makes gasoline

CDU - Crude Distillation Unit - refines crude into products

CFU - Condensate Fractionation Unit

CSU - Condensate Splitter Unit

CCR - Catalytic Reformer

DCU - Delayed Coking Unit

DHDS - Diesel Hydro Desulphurisation Unit

FCC - Fluid Catalytic Cracker - makes gasoline

FCCU - Fluidized Catalytic Cracker Unit

FOHDS- Fuel Oil Hydro Desulphurisation Unit

HOU - Heavy Oil Upgrading - refines fuel oil to lighter products

HCC - Hydro Catalytic Cracker - produces middle distillate fuels

KHDS - Kerosene Hydro Desulphurisation Unit

KHU - Kerosene Hydrotreating Unit

LRCC - Long Residue Catalytic Cracker

RFCC - Residual Fluid Catalytic Cracker - makes gasoline, propylene

RDS - Residual Desulphuriser - reduces sulphur content in product

RHDS - Residue Hydro Desulfurization Unit

RHDS - Residue Hydro Desulphurisation Unit

TBA - To be announced

VDU - Vacuum Distillation Unit

VGO - Vacuum Gasoil Hydrotreater

VRDS - Vacuum Residual Desulphuriser

VSB - Visbreaker

** - thousand tons per year

 