Utilities

Recommended practices for fired process heater instrumentation and control

Burns & McDonnell: Schaffer, C.

Fired process heaters are one of the most critical pieces of equipment within many refinery and petrochemical facilities. Proper instrumentation and control of the equipment has direct bearing on the successful operation of the process, as well as on overall facility process safety.

Driving innovation in the downstream: IRPC returns to New Delhi

Hydrocarbon Processing Staff: Adrienne Blume

Gulf Publishing Company and Hydrocarbon Processing are pleased to announce that IRPC 2017 will be held April 18–20 in New Delhi.

Use the right model to unlock utility system potential

KBC Process Technology Ltd.: Gómez-Prado, J.  |  Hutton, D.

Although we have entered a new era of low energy prices, energy still represents one of the largest, but most easily managed, operating costs in the hydrocarbon industries.

Monitor medium-voltage switchgear in refineries

Emerson Process Management: Murray, J.

When medium-voltage switchgear (MVS) in a refinery fails, it can force a process unit or even an entire refinery to shut down.

Innovations

Hydrocarbon Processing Staff: Andrew, Bob

Where large machines are in use and the overall processes depend on a smoothly functioning plant, companies often rely on fixed maintenance schedules and diagnostic tools.

Innovations

Hydrocarbon Processing Staff: Andrew, Bob

Petron Bataan Refinery (PBR) is the largest integrated crude oil refinery and petrochemicals complex in the Philippines.

Consider post-design changes to confine a hazardous area

Petrokon Utama Sdn Bhd: Bapat, S. V.

Hazardous area classification (HAC) is carried out while performing basic design engineering, and HAC drawings are produced as one of the deliverables.

Innovations

Hydrocarbon Processing Staff: Andrew, Bob

Planned shutdowns, turnarounds and outages (STOs) are often scheduled for preventive maintenance and new equipment installation that must be performed to keep a plant running and in regulatory compliance.

Codes and Standards: How much fireproofing do we need?

The Augustus Group: Murti, D. G.

This article is the first under the Codes and Standards series. The purpose of this series is to make readers aware of code requirements, the interpretations and the limitations as they stand today, and what engineers can do as an alternative engineering. This series is based on the actual implementation of what is narrated and the satisfactory experiences drawn.

Central American nations beef up import infrastructure, fuel production amid demand shift

Contributing Writer: Nogarin, M.
Hydrocarbon Processing Staff: Rhodes, Mike

   Methanex’s methanol facility in Trinidad.