Sivasubramanian, G.
Gopi Sivasubramanian is a Principal Consultant with Arivergy LLC. He has 24 yr of industry experience, most of it with Foster Wheeler and Engineers India Ltd. Mr. Sivasubramanian’s extensive career has included process design, technology and engineering expertise in areas of crude and vacuum distillation, hydroprocessing, hydrogen and sour water stripping/amine treating. His specialties include process design packages, revamp design and engineering, optimization, consulting, studies and PMC team roles.
Project Management: Bridging the gap in revamp projects—From business need to design basis
Revamp projects are notorious for scope creep, cost and schedule overruns.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- India receives fuel oil cargo in Russian SCF tanker after brief halt 4/26
- Biden administration (U.S.) to release SAF tax credit model 4/26
- Boeing, Wagner advance Australia’s SAF Industry 4/26
- S-Oil expects Q2 refining margins to remain steady then trend upward 4/26
- Vitol to charter supertankers from U.S. to Nigeria's Dangote refinery 4/26
- Refiner Valero beats profit estimates on resilient demand, tight supplies 4/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction