Banerjee, P.
Implementing advanced process control on ammonia plants
Petrochemicals
/ Process Control
/ Process Optimization
/ Project Management
/ Acid Gas Removal
/ Americas
/ Analyzers
/ Asia/Pacific
/ Construction
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Information Systems
/ Management
/ Middle East
/ Safety
Benefits exceeding the guarantee were realized through APC by simultaneously stabilizing and optimizing the plant in the presence of significant feed density variations that impact the entire plant operation
Implementing and maintaining advanced process control on continuous catalytic reforming
The primary benefit was an increase in reformate octane barrel yield from operating the plant at its economic constraints
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Braskem Siam partners with Mitr Phol Bio Fuel to use ethanol to produce bio-ethylene/polyethylene 3/21
- Wison Engineering signs FEED contract with WasteFuel for Ankara Green Methanol project in Turkey 3/21
- U.S. slaps Iran-related sanctions on oil tankers, China 'teapot' refinery 3/21
- Regulations needed to spur airlines to use SAF, Japan oil refiners group head says 3/21
- Russia replaces UAE as the top naphtha supplier to India in 2024–25 3/21
- Asia's sour crude demand to rebound on completed regional refinery maintenance and upgrades 3/20
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction