Rolland, G.
Use a systematized approach of good practices in pygas hydrogenation via APC
APC with inferential modeling was successfully applied to pygas hydrogenation units. The lengthening of the catalyst run length limits downtime for both the pygas unit and upstream units such as the steam cracker.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- HIF Global selects Johnson Matthey’s methanol technology for the largest e-methanol plant in South America 5/16
- BASF expands its biomass balance portfolio for selected chemical intermediates 5/16
- INEOS Inovyn launches next-generation recycling pilot plants to strengthen Europe’s PVC recycling 5/16
- How Europe reduced its greenhouse gas emissions in 2023 5/16
- Plug signs contract with Allied Green Ammonia to supply H2 for planned ammonia facility in Australia 5/16
- HSBC to arrange funds for $1.49-B expansion project at Vietnam's Binh Son refinery 5/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction