Pinto, A.
Antonio Pinto is the Plant Design Enterprise Application Engineer at Baker Hughes, a GE Company in Florence, Italy. He has 15 yr of experience in the mechanical design of industrial machines for oil and gas plant systems. His focus areas include TPS products integration and development, monitoring customer interfaces with BHGE products, and looking beyond the company scope into the global oil and gas market.
Project Management: Intelligent 3D model for digital project execution
Digital transformation offers the chance to reorganize and develop new models of collaboration that fully leverage the opportunities offered by digital technologies and their benefits across the oil and gas business—particularly for original equipment manufacturers (OEMs) and engineering, procurement and construction (EPC) contractors.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell to supply integrated automation systems for flagship UK carbon capture projects 12/4
- Aduro Clean Technologies collaborates with ECOCE to advance plastics recycling in Mexico 12/4
- FincoEnergies launches GoodFuels B15: A reliable and compliant drop-in biofuel for inland shipping 12/4
- DevvStream, Southern Energy Renewables target low-cost, carbon-negative SAF and green methanol 12/4
- AFPM: Revised fuel economy standards would put CAFE back on solid legal footing 12/4
- ITT introduced a secondary containment system for its ICM metallic magnetic drive process pump 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

