Kropp, A.
Astrid Kropp is a member of the Technology group at BAYERNOIL and Energy Coordinator for EnCon projects. She holds a degree in chemical engineering [Dipl.-Ing. (FH)], and joined the company in 2005.
Improve energy efficiency with enhanced bundles in tubular heat exchangers
Process Optimization
/ Refining
/ Construction
/ Engineering & Design
/ Equipment
/ Furnaces
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Naphtha
/ Europe
From 2008 to date, 45 twisted tube heat exchangers and bundles have been installed at BAYERNOIL refineries in different units and services, allowing higher heat recovery and contributing to BAYERNOIL’s energy targets.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell to supply integrated automation systems for flagship UK carbon capture projects 12/4
- Aduro Clean Technologies collaborates with ECOCE to advance plastics recycling in Mexico 12/4
- FincoEnergies launches GoodFuels B15: A reliable and compliant drop-in biofuel for inland shipping 12/4
- DevvStream, Southern Energy Renewables target low-cost, carbon-negative SAF and green methanol 12/4
- AFPM: Revised fuel economy standards would put CAFE back on solid legal footing 12/4
- ITT introduced a secondary containment system for its ICM metallic magnetic drive process pump 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

