Kropp, A.
Astrid Kropp is a member of the Technology group at BAYERNOIL and Energy Coordinator for EnCon projects. She holds a degree in chemical engineering [Dipl.-Ing. (FH)], and joined the company in 2005.
Improve energy efficiency with enhanced bundles in tubular heat exchangers
Process Optimization
/ Refining
/ Construction
/ Engineering & Design
/ Equipment
/ Furnaces
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Naphtha
/ Europe
From 2008 to date, 45 twisted tube heat exchangers and bundles have been installed at BAYERNOIL refineries in different units and services, allowing higher heat recovery and contributing to BAYERNOIL’s energy targets.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- ClassNK releases report ‘ClassNK Alternative Fuels Insight (Version 3.0): Providing new information on cost simulations reflecting approval at MEPC 83 5/22
- trinamiX and BASF showcase new technologies for polyamide 6 recycling: An approach to circularity in the textile industry 5/22
- Johnson Matthey to sell Catalyst Technologies business to Honeywell for £1.8 B 5/22
- ADNOC’s suppliers commit to invest AED3 billion in manufacturing facilities across UAE 5/22
- Hungary's MOL and MVM join forces to ship Azeri oil to central Europe 5/22
- Industrial AI: A game-changer in fast-tracking digital transformation in the energy sector 5/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction