Kauders, P.
Peter Kauders studied Natural Sciences and Chemical Engineering at Cambridge University and worked in the UK chemical industry before embarking on a career in engineering and construction in the exploration, gas processing, refining and petrochemical industries. In 2012, he started developing conceptual design emulation (CDE), a computer system that uses mathematics and logic to mimic the steps taken by an engineering team in process plant design. His present research interest is the barriers to undertaking preliminary engineering design directly from a process simulator.
- ... 0 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to shut polystyrene facility in Illinois (U.S.) by the end of the year 6/19
- How ASTM approval of methanol-to-jet accelerates SAF at scale 6/19
- EU crafts plan to give industries extra free CO2 permits this year 6/19
- PetroChina forecasts Chinese oil consumption will drop 4.9% this year 6/19
- Digital Exclusive: Water injection pump mechanical seals failure after pump shutdown 6/19
- Russian gasoline output down 25% so far in June after drone attacks on refineries 6/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

