Pendergrass, J.
John Pendergrass is a Senior Engineer at CPFD LLC with 26 yr of experience applying simulations to multiphase processes. He has worked in the petrochemical industry with both engineering/design and simulation services companies. Over the past 6 yr, he has executed multiple full-scale simulation projects for FCCUs.
Viva Energy’s Geelong refinery reduces FCCU turnaround risk
Maintenance & Reliability
/ Process Optimization
/ Project Management
/ Refining
/ Catalysts
/ Loss Prevention
/ Management
/ Safety
Change involves risk. Many fluidized catalytic cracking units (FCCUs) can be operated more profitably, but changes to achieve more efficient operations can be risky.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Kumho Mitsui Chemicals to increase capacity of MDI production facilities 12/15
- ABS, Eneos, NYK Line and Seacor Holdings launch joint study to develop a methanol marine fuel supply network in the U.S. 12/15
- ENEOS accelerates AI-driven materials discovery of immersion cooling fluids and novel catalysts Using NVIDIA ALCHEMI 12/15
- SAMSUNG E&A wins FEED contract for nearly $5-B SAF plant in the U.S. 12/15
- KBR wins green ammonia project by IGNIS in Spain 12/15
- Phillips 66 announces $2.4-B capital budget for 2026 12/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

