Pendergrass, J.
John Pendergrass is a Senior Engineer at CPFD LLC with 26 yr of experience applying simulations to multiphase processes. He has worked in the petrochemical industry with both engineering/design and simulation services companies. Over the past 6 yr, he has executed multiple full-scale simulation projects for FCCUs.
Viva Energy’s Geelong refinery reduces FCCU turnaround risk
Maintenance & Reliability
/ Process Optimization
/ Project Management
/ Refining
/ Catalysts
/ Loss Prevention
/ Management
/ Safety
Change involves risk. Many fluidized catalytic cracking units (FCCUs) can be operated more profitably, but changes to achieve more efficient operations can be risky.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- From corn fields to cargo ships, ethanol gains early traction as marine fuel 6/12
- Indonesia raises price of widely used fuel by 32%, adds to cost-of-living concerns 6/12
- Technip Energies, Safran, Airbus, Tereos to form green jet fuel venture in France 6/12
- Saipem awarded €900-MM gas compression plant project in Saudi Arabia 6/12
- Trans Mountain pipeline in Canada hits full capacity two years after upgrade 6/12
- MB Energy and Zaffra sign MoU to advance commercialization of eSAF in Europe 6/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

