Maleki, M.
Select optimal schemes for gas processing plants
Gas Processing/LNG
/ Process Optimization
/ Acid Gas Removal
/ Engineering & Design
/ Gas to liquids (GTL)
/ Middle East
/ Natural Gas
/ Sulfur
/ Treating
With careful analysis, meet product requirements and environmental standards
Best practices in treating liquefied petroleum gas are defined
Gas Processing/LNG
/ Refining
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Middle East
Advantages of removing H2S before the LPG unit and energy optimization of the LPG splitter
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Blue Water significantly reduces CO2 emissions by switching to HVO in port operations 7/16
- Swire Shipping launches new carbon insetting program – ‘Voyage to Zero’ 7/16
- PyroGenesis announces completion of coke-oven gas valorization and H2 production project for Tata Steel 7/15
- New protein-based system enables plastic recycling with reusable enzymes 7/15
- CF Industries starts Donaldsonville (U.S.) Complex CO2 dehydration and compression unit, permanent CO2 sequestration 7/15
- Emerson introduces GenAI-enabled automation for power and water industries 7/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction