Sutikno, T.
Optimize energy savings on steam generation
Steam-turbine selection involves evaluating heat duty vs. work requirements in critical service units
Applying instrumented overpressure protection systems
Transient analysis is required to verify their effectiveness
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- EnerMech awarded pre-commissioning scope from Bechtel for Woodside’s Pluto LNG 2 facility 12/9
- Borouge and Borealis launch Recleo™, a global brand for cost-effective mechanically recycled solutions 12/9
- Topsoe and Carbon Neutral Fuels partner to advance e-SAF with SOEC electrolyzer technology 12/9
- IATA: SAF production growth rate is slowing 12/9
- HyOrc secures 10-yr offtake commitment for green methanol pilot 12/9
- ProSep to supply annular injection mixers technology to Saudi Arabian plant 12/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

