Van Hoorn, E. W.
Egbert W. van Hoorn is an independent consultant. He obtained his academic degree in chemical engineering from the University of Twente. Ir. van Hoorn worked 10 yr for Shell and 4 yr for Huntsman before working as a consultant from 1999 for Hocon.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrobras signs on with Baker Hughes for sweeping gas turbines service agreement 3/18
- TwinThread launches Perfect Batch, an AI-powered analytics solution to optimize batch production 3/18
- bp to block union workers from Whiting refinery 3/18
- Analysis: Licocene Terra, using renewable carbon in hot melt polymers for adhesive formulations 3/18
- Ionautics finds breakthrough in iridium-based porous catalyst layer technology for green hydrogen production 3/18
- Universal Fuel Technologies demonstrates fully drop-in synthetic aviation fuel using HEFA byproducts 3/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

