Razalli, R. M.
Razmahwata Bin Mohamad Razalli is a Lead Engineer for IGL Services Sdn Bhd, and earned both BA and MEng degrees. With more than 25 yr of experience in the oil and gas industry in both design and operations, he has upstream and downstream experience in process safety, measurement and allocation, process engineering and offshore technical support, and is also a training provider. The author can be reached at razmahwata.razalli@igl.com.my.
Gas flaring system design and optimization with commercial simulation tool
In the chemicals, petroleum refining and natural gas industries, gas flaring systems are commonly installed for safe operation to burn associated and non-associated gases.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell collaborates with SAF One and Tata Projects to enable sustainable aviation fuel production 1/29
- Casale and OMNI Sign MoA to jointly advance waste-to-green methanol and hydrogen technologies 1/29
- GIZ and thyssenkrupp nucera partner to advance green hydrogen and power-to-X markets in India 1/29
- IACS issues new Unified Requirement on ammonia release mitigation systems 1/29
- TotalEnergies and Mozambique announce the full restart of the $20-B Mozambique LNG project 1/29
- CF Industries, POET launch low-carbon fertilizer pilot to cut ethanol production carbon intensity 1/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

