E. Baum
ELKE BAUM is the Service and Sales Leader for Application Delayed Coking/FCC at IMI Process Automation. With more than 20 yr of experience in high-temperature valve solutions, she has held leadership roles including Head of Aftermarket and Sales Director for North Europe and the CIS. Baum began her career as a Design Engineer at IMI Z&J.
Can double disc isolation valve technology shorten FCCU turnarounds?
Double disc isolation valve technology could hold the key to optimizing dangerous fluid catalytic cracking unit (FCCU) maintenance and repair processes at refineries. This article explores the key considerations behind refinery turnarounds and how they can be made safer and more efficient.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to shut polystyrene facility in Illinois (U.S.) by the end of the year 6/19
- How ASTM approval of methanol-to-jet accelerates SAF at scale 6/19
- Digital Exclusive: Water injection pump mechanical seals failure after pump shutdown 6/19
- Russian gasoline output down 25% so far in June after drone attacks on refineries 6/19
- Iraq to export crude, naphtha through Syria after Hormuz shock 6/19
- Majority of Iranian petrochemical units back to production 6/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

