Chandani, H.
Heena Chandani is a Principal Technical professional with KBR’s automation and process technologies group. She has more than 10 yr of experience in dynamic simulation for engineering studies and operator training simulators. She earned a BE in chemical engineering from the University of Pune, India and an MS degree in chemical engineering from Syracuse University.
Improve stability of ammonia plant steam systems to reduce unscheduled plant shutdowns
Dyno Nobel runs a 2,300-metric tpd purifier plant in Waggaman, Louisiana.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell to supply integrated automation systems for flagship UK carbon capture projects 12/4
- Aduro Clean Technologies collaborates with ECOCE to advance plastics recycling in Mexico 12/4
- FincoEnergies launches GoodFuels B15: A reliable and compliant drop-in biofuel for inland shipping 12/4
- DevvStream, Southern Energy Renewables target low-cost, carbon-negative SAF and green methanol 12/4
- AFPM: Revised fuel economy standards would put CAFE back on solid legal footing 12/4
- ITT introduced a secondary containment system for its ICM metallic magnetic drive process pump 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

