Y. Ha
Case study: Why did the tube sheet of the waste heat boiler deform?
This article analyzes the causes of a 19-mm protrusion of the tube sheet and the tube joint leaks that occurred within a sulfur recovery unit (SRU) waste heat boiler (WHB).
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Neste commissions largest upgrading facility for liquefied waste plastic, scales up chemical recycling 3/16
- South Korea to lift coal cap, boost nuclear output amid Iran crisis 3/16
- Vietnam braces for flight cuts from April after China, Thailand ban jet fuel exports 3/16
- Evonik expands distribution partnership with IMCD for VISIOMER® Specialty Methacrylates in the U.S. 3/13
- RWE to invest €17 B in the U.S. to power data centers 3/13
- Petrobras' refineries operating at 97% of capacity 3/13
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

