Xu, Q.
Consider novel CGC and front-end depropanizer system for olefins production
Petrochemicals
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Boilers
/ Compressors
/ Construction
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Furnaces
/ Heat Transfer
/ Middle East
/ Naphtha
/ Polymers
/ Reactors
In the presented case study, an innovative design for an integrated CGC-DeC3 system introduces part of the heavier condensate from the early compression stages directly into the high-pressure (HP) depropanizer.
Operational optimization for mixed-refrigerant systems
Use rigorous simulation to improve process efficiency
Fine-tune ethylene unit startups
Petrochemicals
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Compressors
/ Construction
/ Engineering & Design
/ Europe
/ Middle East
/ Rotating Equipment
Advanced modeling methods provide useful information on operating main compressor system and feeds
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Westlake Polyethylene achieves ISCC PLUS Certification at Sulphur, Louisiana (U.S.) site 11/7
- Transition Industries, Mitsubishi Gas Chemical sign PSA for ultra-low carbon methanol 11/7
- Malaysia's used cooking oil exports to face pressure in 2026 on domestic SAF production 11/7
- U.S. EPA approves 14 small refinery biofuel waivers 11/7
- China's October crude oil imports rise 8.2% year-on-year, refinery utilization rates highest of year 11/7
- U.S. urges Europe to stick to oil and gas, not renewables 11/7
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

