Conduct a design check for depressurization system for cold conditions
Emergency depressurization is a safety provision designed to release gas from a high-pressure system during emergency situations, such as a fire. An overview of cold depressurization is provided, including factors affecting the temperature profiles and critical factors considered while performing the study.
Design a staggered depressurization sequence for flare systems
Emergency depressurization is one of the most important design provisions for safeguarding facilities in case of an emergency. To overcome limitations of flare system capacity during such a scenario, depressurization can be practiced in a sequential manner. Presented here are the criteria and calculation methods for designing sequential depressurization, along with guidelines for the implementation of recommended designs.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Kumho Mitsui Chemicals to increase capacity of MDI production facilities 12/15
- ABS, Eneos, NYK Line and Seacor Holdings launch joint study to develop a methanol marine fuel supply network in the U.S. 12/15
- ENEOS accelerates AI-driven materials discovery of immersion cooling fluids and novel catalysts Using NVIDIA ALCHEMI 12/15
- SAMSUNG E&A wins FEED contract for nearly $5-B SAF plant in the U.S. 12/15
- KBR wins green ammonia project by IGNIS in Spain 12/15
- Phillips 66 announces $2.4-B capital budget for 2026 12/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction