Bhatt, S.
Conduct a design check for depressurization system for cold conditions
Emergency depressurization is a safety provision designed to release gas from a high-pressure system during emergency situations, such as a fire. An overview of cold depressurization is provided, including factors affecting the temperature profiles and critical factors considered while performing the study.
Design a staggered depressurization sequence for flare systems
Emergency depressurization is one of the most important design provisions for safeguarding facilities in case of an emergency. To overcome limitations of flare system capacity during such a scenario, depressurization can be practiced in a sequential manner. Presented here are the criteria and calculation methods for designing sequential depressurization, along with guidelines for the implementation of recommended designs.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Asia-Pacific ports advance cross-sector hydrogen and eFuel readiness 4/30
- THUNDER project launches to advance carbon-neutral eMethanol production in Europe 4/30
- Lantern LNG selects Honeywell Process and Automation Technologies to drive 12-MMtpy Matagorda Bay facility 4/30
- INEOS Acetyls and Sandpiper Chemicals announce $1.7-B, 1.1-MMtpy low-carbon methanol project in Texas (U.S.) 4/29
- Envision joins AEA Ammonia Certification System pilot to accelerate global clean ammonia trade 4/29
- BASF and Nutrien collaborate on expanding access to low-carbon biofuel markets 4/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

