O'Brien, P.
Patrick O'Brien is an intern with Opportune LLP’s Process and Technology group. After graduating in May with a BS degree in chemical engineering, Mr. O’Brien is pursuing an MS degree in finance at Texas A&M University.
Business Trends: Battle of the biofuels: Renewable diesel vs. biodiesel
Environment & Safety
/ Refining
/ Biofuels
/ Carbon Management
/ Diesel
/ Economics
/ Environment
/ Gasoline
/ Greenhouse Gases
/ Loss Prevention
/ Americas
As new low-carbon diesel fuels and blends become more readily available, it is important to understand the differences between them and how each impacts engine performance.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Axens builds on ExxonMobil MTBE Decomposition Tech for high purity isobutylene production 6/7
- thyssenkrupp Uhde awarded supply of new uhde ammonia converter cartridge including synthesis catalyst by İGSAŞ 6/7
- Leak halts unit at Shell's Pernis oil refinery in Rotterdam 6/7
- Germany triggers EU investigation into Chinese biofuels 6/7
- Russian oil supplies to EU via southern Druzhba to rise 16% in June 6/7
- Aramco, ENI, United Airlines invest in UK-based low-carbon fuel venture 6/7
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction