Veen, M.
Martin Veen is a Senior Solutions Architect with Prometheus Group. Until November 2019, he was Managing Director at RoserConSys BV, a company specializing in turnarounds, shutdowns and outages (STO) software. When Prometheus Group acquired RoserConSys BV in December 2019, Mr. Veen took on the role of STO advisor.
Project Management: Four tips for navigating a shutdown, turnaround or outage successfully
Gas Processing/LNG
/ Maintenance & Reliability
/ Petrochemicals
/ Project Management
/ Refining
/ Economics
/ Loss Prevention
/ Management
/ People
/ Safety
In the oil and gas sector, managing a shutdown, turnaround, or even an outage is an unavoidable requirement.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell to supply integrated automation systems for flagship UK carbon capture projects 12/4
- Aduro Clean Technologies collaborates with ECOCE to advance plastics recycling in Mexico 12/4
- FincoEnergies launches GoodFuels B15: A reliable and compliant drop-in biofuel for inland shipping 12/4
- DevvStream, Southern Energy Renewables target low-cost, carbon-negative SAF and green methanol 12/4
- AFPM: Revised fuel economy standards would put CAFE back on solid legal footing 12/4
- ITT introduced a secondary containment system for its ICM metallic magnetic drive process pump 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

