Veen, M.
Martin Veen is a Senior Solutions Architect with Prometheus Group. Until November 2019, he was Managing Director at RoserConSys BV, a company specializing in turnarounds, shutdowns and outages (STO) software. When Prometheus Group acquired RoserConSys BV in December 2019, Mr. Veen took on the role of STO advisor.
Project Management: Four tips for navigating a shutdown, turnaround or outage successfully
Gas Processing/LNG
/ Maintenance & Reliability
/ Petrochemicals
/ Project Management
/ Refining
/ Economics
/ Loss Prevention
/ Management
/ People
/ Safety
In the oil and gas sector, managing a shutdown, turnaround, or even an outage is an unavoidable requirement.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Pakistan-China to sign MoU on oil-to-chemicals complex in June 5/17
- China biofuel makers bet on sustainable aviation fuel 5/17
- AMETEK Land provides thermal imagers to large ethylene producer 5/17
- China's refinery output falls for first time in 20 mos due to maintenance 5/17
- Dow, SCG Chemicals sign MoU to transform 200,000 tpy of plastic waste into circular products 5/17
- Ukraine long-range attacks continue to disrupt Russian refining, energy operations 5/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction