Alhazemi, A. B.
Abdullah Alhazemi is a Project Engineer at Saudi Aramco with a BS degree in applied mechanical engineering from King Fahd University of Petroleum and Minerals. He began his career as a Maintenance Engineer and now works at the Marjan project. Mr. Alhazemi holds PMP and SMRP certificates.
Spiral heat exchanger technology
Heat exchangers are some of the most critical equipment in the oil and gas industry, as they provide the required temperature of fluid to sustain the plant’s operation.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Technip Energies and Anellotech to jointly develop sustainable plastics recycling 4/22
- BHP says it aims to receive first ammonia-fueled bulk carrier in 2026 4/22
- Biofuels refiner Ecoceres expects Malaysia unit to start up in second half 2025 4/22
- Neste successfully concludes its first processing run with pyrolysis oil from discarded tires 4/22
- NextChem advances plastic upcycling with NX Replast technology, boosting the circular economy 4/22
- BASF now offering polyamides for the textile industry according to Recycled Claim Standard 4/22
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction