Alharbi, B.
Shuja Alharbi works at Saudi Aramco and is a certified PMP with more than 13 yr of experience with turbomachinery and static equipment in the oil and gas industry. He earned a BSc degree in mechanical engineering.
Spiral heat exchanger technology
Heat exchangers are some of the most critical equipment in the oil and gas industry, as they provide the required temperature of fluid to sustain the plant’s operation.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to shut polystyrene facility in Illinois (U.S.) by the end of the year 6/19
- How ASTM approval of methanol-to-jet accelerates SAF at scale 6/19
- EU crafts plan to give industries extra free CO2 permits this year 6/19
- PetroChina forecasts Chinese oil consumption will drop 4.9% this year 6/19
- Digital Exclusive: Water injection pump mechanical seals failure after pump shutdown 6/19
- Russian gasoline output down 25% so far in June after drone attacks on refineries 6/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

