Alshaye, A.
Abdulmajeed Alshaye is an engineering specialist with Saudi Aramco Oil Co. At present, he is responsible for promoting new technologies and practices related to process optimization. He joined the company in 1996, where he started working as a rotating equipment engineer. Since that time, he has held various positions within the company. His main experience is in rotating equipment, process optimization, compressed air, air separation, energy optimization, steam systems, building envelope and HVAC. Mr. Alshaye is an Association of Energy Engineers (AEE)-certified energy manager and a 1996 graduate of King Saud University in Riyadh, Saudi Arabia.
Consider pitot tube pumps for low-flow, high-head applications
Low-flow, high-head pumping requirements in refining and petrochemical plants make up less than 2% of the total pump population. This minor percentage is creating significant reliability concerns, which result in low mean-time between failures (MTBF), as well as high maintenance costs.
Case study: Improve vacuum tower operation with VFD addition
The bottom pump in crude vacuum units is an area of concern for almost all petroleum oil refineries. The harsh operating parameters in which these pumps operate, including high product temperature and significant vacuum suction pressure, have resulted in frequent vacuum tower upsets and low mean time between failures (MTBF) for vacuum bottom pumps.
- 1
- ... 1 pages
- Equinor selects Aker for Mongstad refinery upgrade project 5/1
- Australian researchers testing SAF production from landfill gases 5/1
- ACC responds to U.S. EPA's final risk management rule for methylene chloride 5/1
- Topsoe awarded contract to support FEED study for new low-carbon ammonia plant in Louisiana (U.S.) 5/1
- ClearSign Technologies receives burner contract for California (U.S.) refinery 5/1
- Traders scramble for U.S. storage as distillates demand disappoints 5/1