Winter, G.
Gabriel Winter is an Engineering Specialist with Saudi Aramco. He has more than 20 yr of experience in the areas of process design, process simulation and optimization. In his current position at Aramco, he works with various departments and business lines to develop applications and solutions, using process simulation and optimization models. He earned a Bch degree in chemical engineering from the University of Texas at Austin.
Enhanced unit monitoring enabled by digital twin
Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Process Control
/ Process Optimization
/ Refining
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Hydrocracking
/ Information Systems
/ Loss Prevention
/ Reactors
/ Middle East
Process engineers must continuously monitor the health and performance of process units.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Valero Energy Q4 profit beats estimates; shares surge 1/30
- Dow launches "Transform to Outperform" to raise the competitive industry benchmark for productivity and growth to enable improved returns 1/30
- Russian oil refineries' peak maintenance expected in January and September 1/30
- U.S. lifts some Venezuela sanctions to ease oil sales 1/30
- Keppel, Aster plan sustainable aviation fuel project in Singapore 1/30
- Boeing, Israel's Technion to develop sustainable aviation fuel, as sector grapples with 2050 goal 1/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

