Al-Meshari, A.
How Cr compounds discolor refractory brick walls of an ethylene cracking furnace
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Americas
/ Aromatics
/ Asia/Pacific
/ Corrosion
/ Engineering & Design
/ Europe
/ Furnaces
/ Heat Transfer
/ Middle East
Unusual pink coloration was noticed on the entire refractory brick wall in the radiant section of an ethylene cracking furnace of a petrochemical plant. The problem was investigated by evaluating the ..
Investigation: Failure of a surface condenser titanium tube
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Construction
/ Corrosion
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Heat Transfer
/ Middle East
/ Piping
Advanced analytic methods determine contributing factors in heat exchanger corrosion problem
Failure analysis of a primary reformer riser
Investigation revealed the root cause was creep rupture
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell to supply integrated automation systems for flagship UK carbon capture projects 12/4
- Aduro Clean Technologies collaborates with ECOCE to advance plastics recycling in Mexico 12/4
- FincoEnergies launches GoodFuels B15: A reliable and compliant drop-in biofuel for inland shipping 12/4
- DevvStream, Southern Energy Renewables target low-cost, carbon-negative SAF and green methanol 12/4
- AFPM: Revised fuel economy standards would put CAFE back on solid legal footing 12/4
- ITT introduced a secondary containment system for its ICM metallic magnetic drive process pump 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

