Singh, D.
Meeting diesel specifications at sustained production
Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Biofuels
/ Cetane
/ Construction
/ Crude oil
/ Desulfurization
/ Diesel
/ Distillation
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Furnaces
/ Gasification
/ Gasoline
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Middle East
/ Octane
/ Reactors
New approach rethinks operations of crude and vacuum distillation units to recover more distillate
Redesign crude preheater train for efficiency
Over design of heat exchangers sourced to fouling problems
Improve natural gas liquids recovery
Designing for temperature variations does impact operating costs and unit efficiencies
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Digital Exclusive: Root cause analysis on hydrochloric acid corrosion in a diesel hydrotreater unit 12/16
- Digital Feature: Enabling growth through strategic cost optimization for petrochemical and refining companies 12/16
- Rohm awards NextChem feasibility study for PMMA-polymer chemical recycling plant project 12/16
- Westlake to rationalize certain North American chlorovinyl and styrene assets 12/16
- CMB.TECH invests in Chinese ammonia supply 12/16
- Petrovietnam, BASF cooperate in developing green methanol, pioneering the energy transition 12/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

