Hunsicker, S.
Sean Hunsicker is a Market Manager for Swagelok.
Keeping fugitive emissions costs down with low-E valves
Environment & Safety
/ Maintenance & Reliability
/ Process Control
/ Refining
/ Carbon Management
/ Engineering & Design
/ Environment
/ Equipment
/ Loss Prevention
/ Valves
/ Americas
Fugitive emissions have become an increasingly critical area of interest for chemical processing and refining facilities.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell to supply integrated automation systems for flagship UK carbon capture projects 12/4
- Aduro Clean Technologies collaborates with ECOCE to advance plastics recycling in Mexico 12/4
- FincoEnergies launches GoodFuels B15: A reliable and compliant drop-in biofuel for inland shipping 12/4
- DevvStream, Southern Energy Renewables target low-cost, carbon-negative SAF and green methanol 12/4
- AFPM: Revised fuel economy standards would put CAFE back on solid legal footing 12/4
- ITT introduced a secondary containment system for its ICM metallic magnetic drive process pump 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

