Van Der Eijk, J.
Johan Van Der Eijk is Process Manager at TechnipFMC’s operating center in the Netherlands. He leads the process design department and has 25 yr of experience in process engineering with a specialization in the petrochemical industry. His experience includes work on proposals, studies, grassroots, revamp and development projects as process lead engineer, as well as participation in training, root cause analysis, test runs, startups and troubleshooting. Since 2008, he has been a part of the TechnipFMC Experts Network as an Expert (and since 2014 as Main Expert) in ethylene, with expertise in cracking furnaces.
Triple-lane layout for enhanced cracking coil performance
Ethylene is a precursor to many chemicals, fibers and plastics that are used in daily life.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Yara begins production of renewable-based ammonia in Brazil 12/9
- Two dead, 9 injured, 4 missing in blast at Eni site near Florence 12/9
- Gentari to supply large-scale, carbon-free energy to AMG Ammonia's new green ammonia facility 12/9
- Aramco, TotalEnergies and SIRC assess the development of SAF unit 12/9
- Hycamite, MOLEA and MOL PLUS sign MoU to promote methane-splitting for power generation and marine vessel propulsion 12/9
- California law and refinery closure reflect ongoing challenges for state’s fuel market 12/9
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction