Van Der Eijk, J.
Johan Van Der Eijk is Process Manager at TechnipFMC’s operating center in the Netherlands. He leads the process design department and has 25 yr of experience in process engineering with a specialization in the petrochemical industry. His experience includes work on proposals, studies, grassroots, revamp and development projects as process lead engineer, as well as participation in training, root cause analysis, test runs, startups and troubleshooting. Since 2008, he has been a part of the TechnipFMC Experts Network as an Expert (and since 2014 as Main Expert) in ethylene, with expertise in cracking furnaces.
Triple-lane layout for enhanced cracking coil performance
Ethylene is a precursor to many chemicals, fibers and plastics that are used in daily life.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- BGN announces strategic MoU with XCF Global to produce and supply SAF 11/17
- KazMunayGas and Uzbekneftegaz partner to build 50,000-tpy linear alkylbenzene plant 11/17
- Chevron joins race to explore potential purchase of Lukoil assets, including refineries 11/17
- Abra Group and Sumitomo sign MoU to advance affordable SAF in Brazil 11/17
- Sonatrach signs contract for unit with Sinopec subsidiary to boost gasoline production capacity 11/17
- Verso Energy awards FEED contract to Rely for the DEZiR eSAF project 11/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

