Brun, L. A.
Laurent-Alain Brun is a Process Engineer based in TOTAL Research and Technology in Gonfreville, France. He oversees troubleshooting and process support for crude units for TOTAL Refining and Chemicals. He has 25 yr of experience in refining process support for projects and operation. He earned chemical engineer degrees from Mines de Nancy and ENSPM in Rueil-Malmaison, France.
TOTAL refineries improve overhead systems corrosion and salting with amine-neutralizing technology
Environment & Safety
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Corrosion
/ Crude oil
/ Engineering & Design
/ Environment
/ Equipment
/ Reactors
/ Europe
Weak organic amines are commonly used in crude unit overhead systems to prevent acidic corrosion from chlorides and other acidic contaminants via a neutralization reaction.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Axens builds on ExxonMobil MTBE Decomposition Tech for high purity isobutylene production 6/7
- thyssenkrupp Uhde awarded supply of new uhde ammonia converter cartridge including synthesis catalyst by İGSAŞ 6/7
- Leak halts unit at Shell's Pernis oil refinery in Rotterdam 6/7
- Germany triggers EU investigation into Chinese biofuels 6/7
- Russian oil supplies to EU via southern Druzhba to rise 16% in June 6/7
- Aramco, ENI, United Airlines invest in UK-based low-carbon fuel venture 6/7
- VOC reduction at Raffineria di Milazzo’s SRU complex—Part 2
- Digital Technologies: Do not just monitor bad actor machines: Start when they are healthy
- People
- Editorial Comment
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
- How companies can take advantage of APM solutions to reduce planned maintenance
- Design considerations when flaring ethylene oxide
- Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 1
- Implement advanced level control techniques to improve crude distillation unit stabilizer performance
- Maintenance and Reliability: Non-standard flanges for catalytic cracking units
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction