Orman, S.
SULTAN ORMAN is a Process Superintendent at Tüpraş headquarters, responsible for hydrogen production units. She has experience in building a management information system to monitor the performances of refining process units. She holds MS and BS degrees in chemical engineering from Middle East Technical University and an MBA degree from Koç University in Istanbul, Turkey.
Processing hydrogen-rich gas in a PSA unit
At Tüpraş’ Kırıkkale refinery, adsorbents in pressure-swing adsorption (PSA) units must be reloaded due to the low hydrogen (H2) recovery and low capacity factor of such units.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

