Saka, A.
Aylin Önder Saka is a Simulation Supervisor at Tüpraş headquarters in Turkey. She has previous experience as an Operations Engineer in oil movements, truck loading/unloading and marine loading/unloading, and as a Refinery Process Supervisor in LPG, SHU, KTU and ARU. She holds MS and BS degrees in chemical engineering from Middle East Technical University in Ankara, Turkey.
Management of LPG pool in a complex refinery
Process Optimization
/ Refining
/ Crude oil
/ Distillation
/ Hydrotreating
/ Loss Prevention
/ Treating
/ Europe
LPG pool management is becoming more important as the regulations on the product specifications tighten.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

