Saka, A.
Aylin Önder Saka is a Simulation Supervisor at Tüpraş headquarters in Turkey. She has previous experience as an Operations Engineer in oil movements, truck loading/unloading and marine loading/unloading, and as a Refinery Process Supervisor in LPG, SHU, KTU and ARU. She holds MS and BS degrees in chemical engineering from Middle East Technical University in Ankara, Turkey.
Management of LPG pool in a complex refinery
Process Optimization
/ Refining
/ Crude oil
/ Distillation
/ Hydrotreating
/ Loss Prevention
/ Treating
/ Europe
LPG pool management is becoming more important as the regulations on the product specifications tighten.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Topsoe to support green ammonia flagship project in Saudi Arabia 1/27
- Asahi Kasei, Mitsui Chemicals and Mitsubishi Chemical establish entity for ethylene plant decarbonization 1/27
- Neste supports catalysis research at three universities in Finland 1/27
- Haffner Energy launches the C-iC modular units line to unlock financing for mid-sized biofuel projects 1/27
- Repsol to install second 100-MW electrolyzer at its Petronor refinery 1/27
- Toshiba and Airbus drive the future of hydrogen-powered flight with superconducting motors 1/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

