Hay, G.
Glen Hay is Vice President of Business Development with Virtual Materials Group Inc. in Alberta, Calgary, Canada. His experience is focused on reactors, heat transfer units, and overall plant modeling and optimization. He holds a BS degree in chemical engineering from the University of Calgary and an MS degree in advanced process control.
Reduce coke formation and save operating costs with optimization of DMDS into ethane cracking furnaces
Steam cracking furnaces produce olefins, which are high-value feeds in the petrochemical industry. Coke formation is an unavoidable part of a thermal cracking furnace.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell to supply integrated automation systems for flagship UK carbon capture projects 12/4
- Aduro Clean Technologies collaborates with ECOCE to advance plastics recycling in Mexico 12/4
- FincoEnergies launches GoodFuels B15: A reliable and compliant drop-in biofuel for inland shipping 12/4
- DevvStream, Southern Energy Renewables target low-cost, carbon-negative SAF and green methanol 12/4
- AFPM: Revised fuel economy standards would put CAFE back on solid legal footing 12/4
- ITT introduced a secondary containment system for its ICM metallic magnetic drive process pump 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

