Farris, M.
Mark Farris is director of projects for Wood Group Mustang’s process plants and industrial business unit. He has more than 35 years of experience overseeing the execution of refining and chemical projects. He is a graduate of the University of Houston and is a registered professional engineer in Texas and three other states.
Case study: Plan and execute a coke drum replacement project
Americas
/ Maintenance & Reliability
/ Engineering & Design
/ Project Management
/ Refining
/ Management
The delayed coking unit is a critical part of a refinery’s crude oil process flow and profitability.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Honeywell to supply integrated automation systems for flagship UK carbon capture projects 12/4
- Aduro Clean Technologies collaborates with ECOCE to advance plastics recycling in Mexico 12/4
- FincoEnergies launches GoodFuels B15: A reliable and compliant drop-in biofuel for inland shipping 12/4
- DevvStream, Southern Energy Renewables target low-cost, carbon-negative SAF and green methanol 12/4
- AFPM: Revised fuel economy standards would put CAFE back on solid legal footing 12/4
- ITT introduced a secondary containment system for its ICM metallic magnetic drive process pump 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

