Fisher, P.
Monitor safety with improved risk performance indicators
Environment & Safety
/ Process Control
/ Information Systems
/ Loss Prevention
/ Management
/ Safety
Using Layer of Protection Analysis (LOPA) and real-time operational data, statistical estimates of the frequencies of future hazardous events can be generated. Combined with a qualitative estimate of the severity of hazardous events and the tolerable frequency determined in the LOPA, an objective leading metric of hazardous events can be created.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- From corn fields to cargo ships, ethanol gains early traction as marine fuel 6/12
- Indonesia raises price of widely used fuel by 32%, adds to cost-of-living concerns 6/12
- Technip Energies, Safran, Airbus, Tereos to form green jet fuel venture in France 6/12
- Saipem awarded €900-MM gas compression plant project in Saudi Arabia 6/12
- Trans Mountain pipeline in Canada hits full capacity two years after upgrade 6/12
- MB Energy and Zaffra sign MoU to advance commercialization of eSAF in Europe 6/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

