Forbes, B.
Brandon Forbes has 14 yr of experience designing steam and liquid heating systems for refinery and chemical applications. He now oversees product development for Controls Southeast Inc., an AMETEK company. He received his Bch degree in mechanical engineering from the University of North Carolina Charlotte, and obtained his PE while working at CSI.
Strategies to minimize piping thermal maintenance system cost without compromising performance
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Economics
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Piping
/ Americas
/ Middle East
Where process fluid must be maintained within a certain operating temperature window, the piping will likely require the application of a thermal maintenance system.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Bechtel greenlit for Sabine Pass Liquefaction expansion in Southwest Louisiana (U.S.) 5/29
- Philippines receives rare Iranian crude cargo after wartime disruption 5/29
- Gazprom and Sibur resume talks on possible ethane project to supply additional feedstock to the Kazanorgsintez petrochemicals plant 5/29
- European Commission debates policy shift to protect industry from China 5/29
- Mitsui seeks LNG investments to meet power demand from data centers 5/29
- Kenyan government backs Gulf fuel supply deals after opposition criticism 5/29
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

