Forbes, B.
Brandon Forbes has 14 yr of experience designing steam and liquid heating systems for refinery and chemical applications. He now oversees product development for Controls Southeast Inc., an AMETEK company. He received his Bch degree in mechanical engineering from the University of North Carolina Charlotte, and obtained his PE while working at CSI.
Strategies to minimize piping thermal maintenance system cost without compromising performance
Maintenance & Reliability
/ Petrochemicals
/ Process Optimization
/ Refining
/ Economics
/ Engineering & Design
/ Equipment
/ Loss Prevention
/ Piping
/ Americas
/ Middle East
Where process fluid must be maintained within a certain operating temperature window, the piping will likely require the application of a thermal maintenance system.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to shut polystyrene facility in Illinois (U.S.) by the end of the year 6/19
- How ASTM approval of methanol-to-jet accelerates SAF at scale 6/19
- EU crafts plan to give industries extra free CO2 permits this year 6/19
- PetroChina forecasts Chinese oil consumption will drop 4.9% this year 6/19
- Digital Exclusive: Water injection pump mechanical seals failure after pump shutdown 6/19
- Russian gasoline output down 25% so far in June after drone attacks on refineries 6/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

