Kropp, A.
Astrid Kropp is a member of the Technology group at BAYERNOIL and Energy Coordinator for EnCon projects. She holds a degree in chemical engineering [Dipl.-Ing. (FH)], and joined the company in 2005.
Improve energy efficiency with enhanced bundles in tubular heat exchangers
Process Optimization
/ Refining
/ Construction
/ Engineering & Design
/ Equipment
/ Furnaces
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Naphtha
/ Europe
From 2008 to date, 45 twisted tube heat exchangers and bundles have been installed at BAYERNOIL refineries in different units and services, allowing higher heat recovery and contributing to BAYERNOIL’s energy targets.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Petrobras selects Honeywell's ethanol-to-jet technology for large-scale SAF plant 4/14
- Technip Energies awarded two FEED contracts by SOGARA for refinery complex in Gabon 4/14
- SUBLIME Energie inaugurates world's first system capable of liquefying biogas into a renewable fuel 4/14
- Petrobras in talks with Mubadala to buy back Mataripe refinery 4/14
- bp's new CEO to simplify company structure into upstream, downstream units 4/14
- Vitol to invest $130 MM to boost South African storage capacity in Durban 4/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

