Müller, A.
Antje Müller is a member of the Technology group at BAYERNOIL, and is responsible for heat exchanger design, and process and flare systems simulations. She holds a degree in chemical engineering [Dipl.-Ing. (univ.)], and joined the company in 2005.
Improve energy efficiency with enhanced bundles in tubular heat exchangers
Process Optimization
/ Refining
/ Construction
/ Engineering & Design
/ Equipment
/ Furnaces
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Naphtha
/ Europe
From 2008 to date, 45 twisted tube heat exchangers and bundles have been installed at BAYERNOIL refineries in different units and services, allowing higher heat recovery and contributing to BAYERNOIL’s energy targets.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- SAFFiRE Renewables breaks ground on SAF pilot plant in Kansas (U.S.) 9/20
- Technip Energies and KBR selected for a major LNG project by Lake Charles LNG 9/20
- UPM Biochemicals and Södra accelerate the commercialization of innovative lignin-based solutions 9/20
- LanzaTech signs MLA with SEKISUI to develop multiple commercial-scale waste-to-ethanol plants across Japan 9/20
- Twelve announces $645 MM in funding to transform CO2 into jet fuel and electrochemicals at scale 9/20
- Chinese court declares another Sinochem refinery bankrupt 9/20
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction